Budget planning
The budget target is mapped in a differentiated manner and blended with the prioritised operating assets. In planning mode, budget targets are varied and possible scenarios are examined. The resulting measures are calculated and optimised. In addition to the condition and the spatial or topological network aspects, the measures of third parties are also taken into account.
The planning of measures relieves the subsequent departments of unnecessary coordination and leads to more efficient planning. The calculation and simulation of resource requirements avoids impending bottlenecks.
The signion software solution for operational asset management optimally supports investment planning.